How to set up charging pile station?


Release time:

2024-02-17

Not long ago, the general office of the State Council issued the guiding opinions on further building a high-quality charging infrastructure system. The opinions pointed out that by 2030, a high-quality charging infrastructure system with wide coverage, moderate scale, reasonable structure and perfect functions will be basically completed, which will effectively support the development of new energy vehicle industry and effectively meet the people's travel charging needs.

Driven by national policies and the rapid development of new energy vehicles, the market demand for charging piles has exploded, and more and more investors have begun to consider investing in charging stations. The following is to sort out the process of building a charging pile station: (be sure to remember to collect it ~)

1. confirm the appropriate site

1, there are sufficient and suitable parking spaces or green parking spaces.

2. Parking spaces are convenient for import and export. Don't be stuck in traffic frequently.

3. The site ownership is clear, which can ensure the normal operation of the station.

4. It can be located near the well-equipped residential buildings, business circles, high-speed railway stations and railway stations. There is no large charging pile station in the surrounding area (avoid hospitals, government units, and areas with large electricity consumption for public livelihood)

 

2. go to the NDRC website for the record

With the following information to the provincial and municipal supervision platform for the record, to the local development and reform commission website to submit information. After passing the examination and approval of various departments, the filing certificate can be obtained.

1. A telephone number is required (the mobile phone number authenticated by the real name of the legal person ID card).

2, the need for legal person ID registration.

3. The detailed address of the station, the number of charging piles and the cost planning are required.

4, the need to provide the company's unified social credit code.

 

3. land legality and use audit

After obtaining the filing certificate, you can go to the Land and Resources Bureau for land legality review to clarify the nature of the land and the ownership of property rights. After clarifying the legality of the target land, go to the Planning Bureau for land use review.

 

4. power application and site construction

After getting the information of the above processes, you can bring the information to the power bureau for application. The power bureau will examine and approve the above materials. After the examination and approval is completed, relevant documents can be issued, and then the construction can be carried out.

According to the power consumption situation on site, it is determined whether the transformer needs to be erected. If the transformer needs to be erected, the transformer can be purchased through the installation approval document submitted by the power department. It can be erected by the power department or constructed by a third-party enterprise. After the erection is completed, the power department will conduct acceptance.

 

5. procurement of charging piles and other equipment of the station

It is recommended to purchase brand charging piles, and the quality and service are guaranteed. According to the parking space and power situation of the station, choose and buy suitable charging piles, including 7KW and 14KW AC charging piles; 30KW, 40KW integrated small DC charging pile, 60KW, 80KW, 120KW, 160KW, 180KW, 240KW integrated DC charging pile; 360KW, 480KW, 600KW, 720KW and other split DC charging piles (flexible charging piles) and other products meet the needs of different sites. Under the condition of limited transformer surplus power, it is suggested that fast charging should be given priority to, slow charging should be supplemented, and installed together.

 

6. station operation

After the installation is completed, carry out system debugging to see if there is a problem, let the third-party tester conduct the test, and give the test report. After there is no problem, it can be put into operation.

The above are the six main processes for the construction of charging stations, but the policies of each place will be different, and specific analysis of specific issues is required. It is recommended that investors must understand the policy situation of the project location in detail before preparing for the project.


Contact Information

+86-400-696-6667

Enterprise E-mail: kuaiyidianguanfang@kedcharge.com

Enterprise Website: www.kedcharge.com

Group Headquarters: Building C4, ICV Park, Chongqing Road, Baohe Economic Development Zone, Hefei City
Production Base (Hefei): No. 215 Mingchuan Road, Baiyan Industrial Park, High-tech Zone, Hefei City, Anhui Province
Production Base (Hangbu): Intersection of Wanfohu Expressway and Shengli Avenue, Hangbu Town, Anhui Province

Copyright©2024 Anhui KED New Energy Technology Group Co., Ltd.

ewm ewm

ewm ewm

ewm ewm